North Carolina Department of Transportation (NCDOT):

  • NCDOT Design-Build Project R-2633AA & AB Wilmington By-pass – Sub-consultant to provide utility coordination services for a freeway on new alignment from NC 87 to US 74/US76 in Brunswick County. There are 10 utility owners on the project to provide plans, schedules, coordinate and negotiate potential conflict resolutions.

  • NCDOT Design-Build Project I-3803B I-85 Widening – Sub-consultant to provide water and sewer design/relocation services and utility coordination services for the I-85 widening and interchange reconstruction from south of Bruton Smith Boulevard/Concord Mills Boulevard to NC 73 in Cabarrus County. There are 9 utility owners on the project to provide plans, schedules, coordinate and negotiate potential conflict resolutions.

  • NCDOT Division 12 Low Impact Bridge Replacements – Sub-consultant to provide utility coordination services for 7 bridge replacement projects within Division 12.

North Carolina Turnpike Authority (NCTA):

  • NCTA Project - Garden Parkway - Sub-consultant providing water and sewer design services for new location roadway from I-85 west of Gastonia in Gaston County to I-485/NC160 near the Charlotte-Douglas International Airport in Mecklenburg County (approximately 23 miles).

North Carolina Department of Transportation (NCDOT) in conjunction with Charlotte-Mecklenburg Utilities:

  • NCDOT Project U-209B Independence Blvd. Widening - Providing the design and/or relocation of existing water and sewer facilities which includes approximately 3.600 feet of 30-inch ductile iron water pipe, 10,500 feet of 24-inch ductile iron water pipe, 12,000 feet of 12-inch ductile iron water pipe, 12,000 feet of 8-inch ductile iron water pipe, 5,000 feet of 6-inch ductile iron water pipe, and 22,000 feet of 8-inch ductile iron sewer pipe. The work includes design surveys, SUE, construction drawings, specifications, materials estimate, permitting, and inspection services.

  • NCDOT Project R-0211EC I-485 Interchange at Weddington Road - Providing the design and/or relocation of existing water and sewer facilities which includes a 16-inch water main relocation. The work includes design surveys, construction drawings, specifications, materials estimate, and permitting.

  • NCDOT Project R-2248E I-485 from East US 21 to West I-85 - Providing the design and/or relocation of existing water and sewer facilities. The work includes construction drawings, specifications, materials estimate, cost estimate, and permitting.

  • NCDOT Project R-2123CE I-485/I-85 Interchange - Providing the design and/or relocation of existing water and sewer facilities. The work includes construction drawings, specifications, materials estimate, cost estimate, and permitting.

  • NCDOT Project U-2507A Mallard Creek Road (SR 3135) - Providing the design and/or relocation of existing water and sewer facilities. The work includes construction drawings, specifications, materials estimate, cost estimate, and permitting.

  • NCDOT Project B-4779 Bridge No. 147 over Mallard Creek on US 29 - Providing the design and/or relocation of existing water and sewer facilities which includes a 36-inch sewer main relocation and a 16-inch water main relocation. The work includes design surveys, construction drawings, specifications, materials estimate, and permitting.

  • NCDOT Project B-4200 Bridge No. 100 on McCoy Road over Gar Creek - Providing the design and/or relocation of existing water and sewer facilities which includes a 16-inch water main relocation. The work includes design surveys, construction drawings, specifications, materials estimate, and permitting.

  • NCDOT Project B-4201 Bridge No. 38 over Irvins Creek on Sam Newell Road - Providing the design and/or relocation of existing water and sewer facilities which includes a 16-inch water main relocation and a 30-inch sewer main relocation. The work includes design surveys, construction drawings, specifications, materials estimate, and permitting.

Charlotte-Mecklenburg Utilities:

  • Statesville Road Widening Water Mains - Sub-consultant providing the design and/or relocation of existing water and sewer facilities which includes approximately 11,000 linear feet of 12-inch ductile iron water pipe. The work includes design surveys, utility coordination, construction drawings, specifications, materials estima

  • 2009-2010 Charlotte-Mecklenburg Utilities "Professional Engineering Services for Utility Projects within NCDOT Projects" – Serving as the prime on the 2009-2010 Charlotte-Mecklenburg Utilities open ended “on-call” contract to perform design services on various water and sewer projects. The work includes individual Charlotte-Mecklenburg Utilities projects, as well as, Charlotte-Mecklenburg Utilities work within NCDOT projects.

  • Charlotte-Mecklenburg Utilities 2009 Annexation Projects (Eastfield Area) – Sub-consultant to provide design support, permitting, encroachments, NCDOT coordination, and utility coordination.

  • Charlotte-Mecklenburg Utilities 2009 Annexation Projects (HoodEastfield Area) – Sub-consultant to provide design support, permitting, encroachments, NCDOT coordination, and utility coordination.

City of Charlotte:

  • Milhaven Sidewalk Project - Sub-consultant to provide the design and/or relocation of existing water and sewer facilities. The work includes construction drawings, specifications, materials estimate, and permitting.

  • City of Charlotte Streetcar Project - Sub-consultant to provide utility coordination services.

  • Brevard Street Improvements Sub-consultant to provide utility coordination services.

  • South Tryon Streetscape Project - Sub-consultant to provide utility coordination services.

  • North Tryon Streetscape Project - Sub-consultant to provide utility coordination services.

  • City of Charlotte Neighborhood Improvement Projects – Enderly Park and Revolution Park Sub-consultant to provide the design and/or relocation of existing water facilities. Enderly Park: Replace approximately 850 linear feet of existing 2-inch with a new 6-inch PVC/DI water main. Revolution Park: Replace approximately 805 linear feet of existing 2-inch water main with a new 2-inch PVC water main. The work will include construction drawings, specifications, materials estimates, and permitting.

Land Development:

  • River Run Phase V - Davidson, NC - Providing the site design, grading plans, roadway design, water and sewer design, storm drainage design, and erosion control for the 121 lot subdivision.

  • The Summit at River Run - Davidson, NC - Providing water design, as-built drawings, and plats for recordation.